NIC 422006 - Construction and maintenance of water main and line connection, water reservoirs including irrigation system (canal)

NIC 422006 classifies construction and maintenance of water main and line connection, water reservoirs including irrigation system (canal) as a final six-digit construction activity under Section F and Division 42....

Level Sub-class
Depth 5/5
Children 0
Last verified 2026-04-21

Source Verification for 422006

10 / 10

4 of 4 factors passing

How we calculate this score →

NIC 2008 -> NIC 2025 Mapping for 422006

NIC 2008 links are discovery matches from the local converter layer. Verify final migration decisions against official source documents.

NIC 2008 42204 high

Construction and maintenance of water main and line connection, water reservoirs including irrigation system (canal)

NIC 2008 42202 medium

Construction/erection and maintenance of power, telecommunication and transmission lines

Practical Summary

What Construction and maintenance of water main and line connection Means Under NIC 2025

NIC 422006 is the final six-digit endpoint for Construction and maintenance of water main and line connection, water reservoirs including irrigation system (canal). It should be selected only when the enterprise's primary construction activity matches this title more closely than 422001 Construction of thermal and nuclear power plants, 422002 Construction of hydropower plants and Pumped Storage Projects, 422003 Construction, erection, and maintenance of power transmission and distribution lines, including radar infrastructure for grid monitoring, load balancing, fault detection, and overhead lines or conductor rails for railways..

How To Choose

When to Choose 422006 Over Nearby Codes

Choose 422006 only when operations, invoices and revenue narrative align with Construction and maintenance of water main and line connection, water reservoirs including irrigation system (canal). If the activity also includes 422001 Construction of thermal and nuclear power plants, 422002 Construction of hydropower plants and Pumped Storage Projects, 422003 Construction, erection, and maintenance of power transmission and distribution lines, including radar infrastructure for grid monitoring, load balancing, fault detection, and overhead lines or conductor rails for railways., compare those pages before filing.

In this section

Common Questions About NIC 422006

Does NIC 422006 cover a full construction project or a specialized trade?

Use building or civil engineering codes for whole-project construction. Use specialized construction codes when the firm mainly performs electrical, plumbing, HVAC, demolition, roofing, finishing or similar trade work.

Can a contractor use NIC 422006 if work is subcontracted?

Use the code that reflects the contractor's own contracted responsibility. A project developer, civil contractor and specialist installer can fall under different NIC codes even on the same site.

How do I verify that NIC 422006 is correct before filing?

Check the parent hierarchy, compare 422001 Construction of thermal and nuclear power plants, 422002 Construction of hydropower plants and Pumped Storage Projects, 422003 Construction, erection, and maintenance of power transmission and distribution lines, including radar infrastructure for grid monitoring, load balancing, fault detection, and overhead lines or conductor rails for railways., and confirm that the official title matches the main revenue activity. For regulated or filing-critical decisions, verify the source row in the MoSPI dataset.

What happens if I use the wrong NIC code in Udyam or MCA registration?

A wrong code can cause mismatched business descriptions, follow-up questions or later compliance cleanup. It is better to compare nearby codes before filing than to correct a weak classification later.

Is there a legacy NIC 2008 equivalent for NIC 422006?

Use the legacy converter only as a migration aid. Old NIC 2008 matches can suggest where to look, but NIC 2025 should remain the primary reference for new code selection.

NIC 2026 guidance

Before you select NIC 422006

NIC 422006 should be selected only when the official title matches the main revenue-generating activity. If the business also trades, transports, processes, installs or supports the same product or service, compare nearby NIC pages before filing. This reduces the risk of choosing a code that describes the product being handled rather than the activity your enterprise actually performs.

Data Source and Verification Date

Source layer

Official NIC 2025 Excel and PDF from MoSPI.

Last verified

2026-04-21 from the generated NIC 2025 source layer used in this build.

Disclaimer

This is an independent reference tool. Verify filing-critical decisions in official sources.